The production cutover runbook

What happens before, during and after the production load, and how each load is confirmed.

A production load repeats, within a compressed window, the sequence proven in the final test cycle in a Salesforce full sandbox. The runbook makes that repetition exact: every task in order, each with an owner, a status and a record of what was loaded. It also sets the timing and freeze windows, the rollback conditions, the delta strategy and the go or no-go criteria for the load.

Diagram of a data migration cutover plan before, during and after go-live
A high-level view of a typical cutover: before, during and after the production load.

Before the load, the environments are backed up and every limit and permission the load depends on is confirmed. During the load, objects are loaded in dependency order, and no task begins until the tasks it depends on are complete. After the load, normal operation is restored and validation reports are produced for the business to review.

A load is declared complete only after internal QA is performed and a senior team member has reviewed and validated the results. That review separates having loaded the data from having proven it is right.